Field-proven across 6 continents

Real installations, real numbers, real customers.

A selection of recent BESS deployments we can talk about publicly. NDA prevents listing all our customers — get in touch for sector-specific reference letters.

450+
BESS projects delivered
Through 2025
2.8GWh
Cumulative installed
Across all categories
150+
Countries reached
Direct & via partners
98.7%
Avg. system uptime
Across deployed fleet
All Utility C&I Microgrid Telecom Residential
Ukraine 15MWh project
UTILITY

Dynamo Kyiv 15MWh / 3.75MW grid storage hub

Dynamo Kyiv, Ukraine · Commissioned 2025

Ten 5MWh containerized BESS units providing peak shaving, frequency regulation and arbitrage services to a Tier-1 Ukrainian utility offtaker. Connected at 33kV through an SMS-supplied MV transformer station. EMS supports IEC 61850 and integrates with the operator's SCADA for ancillary-services dispatch.

15 MWh
Total energy
3.75 MW
PCS rating
4 hrs
Duration

"From signing to first energization in 11 months. SMS handled grid code compliance end-to-end — we just operated the asset."
— Project Director, IPP Operator

MICROGRID

Brazil mining microgrid + diesel hybrid

Minas Gerais, Brazil · Commissioned 2023

Off-grid copper mining site previously running on 24/7 diesel generators. SMS designed a 4MW solar PV array + 8MWh BESS hybrid system that displaces ~30% of diesel runtime annually. EMS coordinates PV, battery, and gensets in real-time, automatically black-starting the BESS during weather events.

8 MWh
BESS energy
4 MW
PCS power
30%
Diesel reduction

"Annual diesel savings paid back the project in 4.2 years. The remote monitoring app means our team in Belo Horizonte can manage the site without weekly visits."
— Operations Manager, Mining Group

Brazil mining microgrid
Thailand C&I
C&I

Bangkok manufacturing peak-shaving

Bangkok, Thailand · Commissioned 2024

Electronics manufacturing facility operating two production shifts. Three Dyna Pod B261 (261kWh) liquid-cooled cabinets discharge during 18:30–22:00 peak window, charge from solar rooftop and grid during off-peak. Deployed in 14 weeks from PO to commissioning, including all permits.

645 kWh
Total energy
300 kW
PCS power
22%
Bill reduction
More deployments

A selection from our active portfolio

Want to be our next case study?

We provide reference projects, customer letters, and even site visits to potential customers — once you sign with us, you join a network of 450+ operators worldwide.